2/1/13
Finished: I
have finished the STEMM report, which we will be getting back soon
In Progress: With
the marking period just starting, we have not received any immediate deadlines
for upcoming projects, so no work is currently being done
In the Future: Once
we get our assignment packet, I will start to work on what is coming up in the
development of the senior project.
2/5/13
Finished: The
packets have been distributed to the class detailing work and deadlines that is
approaching.
In Progress:
I am reading over the packets to see the extent of the work that needs to be
done
In the Future:
No work is currently being done
2/7/13
Finished:
No notable work has been done.
In Progress: I
will not be in school from tomorrow the 8th to Monday the 11th,
so no significant work is being done.
In the Future: I
will not be in school from tomorrow the 8th to Monday the 11th,
so no significant work will be done.
2/12/13
Finished:
I was not in school from tomorrow the 8th to Monday the 11th,
so no significant work was done.
In Progress: I
was not in school from tomorrow the 8th to Monday the 11th,
so no significant work is being done.
In the Future: I
am working on finalizing my materials that I will be ordering to construct my
land sailor
2/15/13
Finished: I
am starting to look back into my parts list to see what needs to be ordered via
the inquiry sheet
In Progress:
I am updating any missed logs since my absence one week ago.
In the Future:
2/20/13
Our instructors have informed us
that we will be using standardized electronic parts that the school will
provide, so servos, batteries, receivers, and controllers will not need to be
ordered.
2/22/13
Research has continued on the parts
list. However, I am debating whether the
wheels should be ordered or if they should be bought with the rest of my basic
materials
2/26/13
I have located where I can find most
of the rest of the parts that I need for construction
3/1/13
No notable work has been done in this
time period
3/6/13
After consulting my partner and instructor,
I have decided to rework some of the support structures on my 3D CAD model to
reduce unnecessary materials, thereby cutting down the weight
3/8/13
I am finishing up the new CAD models
to include a more compact support system
3/13/13
No notable work has been done in
this time period
3/15/13
No notable work has been done in
this time period
3/20/13
My partner and I have begun to
compare and comment on each other’s CAD renderings, seeing where each of us
thinks the other can improve.
3/22/13
I am working on adding some of the
suggestions that my partner has proposed about my design
3/26/13
No notable work has been done in
this time period
3/29/13
I
have begun to look over some of the assignments due at the end of the marking
period, and I have begun to organize what I am including in my poster.
4/3/13
After
looking through a catalogue given to me by one of my instructors, I have chosen
the wheels that I will be using for the final design.
4/5/13
I
am currently awaiting the delivery of my wheels. In this time, I have started to draw the CAD
models of my new steering systems taking into account the changed sizes of the
wheels.
4/10/13
In
the past week, I have received the wheels that I have ordered. However, presentations have started, so no
work has been done
4/12/13
Presentations,
no work was done
4/17/13
Presentations,
no work was done